皇冠体育官网app(www.hg108.vip):Fukushima debris removal delayed by another year

皇冠体育官网appwww.hg108.vip)是一个开放皇冠体育官网代理APP下载、皇冠体育官网会员APP下载、皇冠体育官网线路APP下载、皇冠体育官网登录APP下载的皇冠体育官网平台。皇冠体育官网APP上最新登录线路、新2皇冠体育官网更新最快。皇冠体育官网APP开放皇冠体育官网会员注册、皇冠体育官网代理开户等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

UG官网下载www.ugbet.us)开放环球UG代理登录网址、会员登录网址、环球UG会员注册、环球UG代理开户申请、环球UG电脑客户端、环球UG手机版下载等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。